Incoming inspection
Inspection at material inward, before raw material storage and fabrication.
Incoming, internal and final inspection, supported by documented manufacturing, grit blasting and painting processes.
Pioneer Filters is described as an ISO 9001:2015 certified company in its company profile. Contact the team for the current certificate and vendor documentation.
Explore the manufacturing sequence and the in-house finishing workflows.
From material inward to dispatch, including three inspection stages.
Surface preparation and roughness checking before painting.
Shot blasting distances shown in the supplied process chart.
The process chart uses a 65 μm roughness threshold.
Paint preparation, application, finish measurement and verification.
Additional paint application or return to the previous process follows the documented check result.
The finished component proceeds only after the relevant checks.
The company’s documented process includes inspection at material receipt, during manufacturing and before dispatch.
Inspection at material inward, before raw material storage and fabrication.
An internal check within the manufacturing sequence, before grit blasting and painting.
Inspection before packing, finished goods storage and dispatch.
Dry film thickness measurements at six points per square metre.
Peel-off testing at the inspection area, with return to the previous process on failure.
Four mechanical engineers and a workforce with more than half its employees skilled.